Projects › Massachusetts › Boston Metro
MassDOT design-build bridge replacement carrying Route 3 over the North River, about $19.4M. Bid opening 12/10/2026 at 2:00 PM. Source: https://hwy.massdot.state.ma.us/webapps/const/statusReport.asp Listed by BidSH research from public bid advertisements — verify details at the source.
No bidders yet. Be the first.
✋ Bid this project / see contacts →